Liverpool Canal Link, May 2007 - page 1

Liverpool Link - link to Latest Photos of Construction

Photos showing progress on the construction of the Liverpool Canal Link, May 2007. [Page 1, Page 2.]

Site of Floating Roadway, Liverpool canal link
The line of the former "Floating Roadway" has been infilled, to create road access to the new Cruise Liner facility and ferry terminal.
first tunnel section, Liverpool canal link
The first section of canal tunnel has been constructed, across the infilled Floating Roadway site.
first tunnel section, Liverpool canal link
Veiw inside the first section of tunnel, looking northwards.
first tunnel section, Liverpool canal link
Looking southwards inside the first section of tunnel.
culvert at Pier Head, Liverpool
An unused culvert was unexpectedly unearthed during excavation, which is believed to have been used for draining George's Dock. A disused Victorian sewer was also uncovered.
Liverpool canal link
Opposite Water Street, the service pipes to the buildings on the seaward side, including the new ferry terminal, have been lowered so that they will run below the new canal channel.
old river wall, Liverpool canal link
In front of the Cunard Building, an old section of river wall has been uncovered, dating from the 1760s. This wall marked the shoreline after George's Dock was constructed. This wall is to be preserved and covered up again after the new canal channel has been constructed a short distance in front of it.
Work on Liverpool Link - next page of photos

Work on Liverpool Link - See October 2008 photos

Work on Liverpool Link - See May 2008 photos
Work on Liverpool Link - See October 2007 photos


Leeds and Liverpool Canal home page