Huddersfield Narrow Canal
Inside Standedge Tunnel (1)
      
Marsden portal - (Photo: British Waterways)
(Photo: British Waterways)

Inside the tunnel at Marsden Portal.

De-silting (Photo: British Waterways)
(Photo: British Waterways)

De-silting the canal bed.

Before work to renovate the roof and walls can take place, a huge volume of silt has to be removed. In places the silt was up to six feet deep. (The canal was deeper than normal in the tunnel as the summit pound acted as a reservoir.)

Stone lined section of tunnel - (Photo: British Waterways)
(Photo: British Waterways)

About half of the length of the tunnel is lined with brick or stone.
Most of the lined sections are in reasonably good condition and only require re-pointing.

(Photo: British Waterways)
(Photo: British Waterways)

Working on a platform to re-point the side walls.

    