Winter canal work programme, 2010-2011

British Waterways and MSSC have announced details of the winter closure programme affecting canals in the South Pennine area to enable repairs and maintenance work to take place.

Information from British Waterways and Manchester Ship Canal Company.
The information shown on this page is believed to be correct but if you are planning to travel by canal during this period you should check the details with the local waterways office.

change of dates
Canal: Closure dates: Location: Purpose of closure:
Aire and Calder Navigation no stoppages planned    
Ashton Canal 18th Nov -- 17th Dec 2010
Lock 8 lock gates replacement
18th Nov -- 24th Dec 2010
Locks 15 & 16 re-build lock linings
Bridgewater Canal
21st March - 2nd 5th April 2011
stoppage extended
Barton Aqueduct closed for annual maintenance works on structure.
(closes 4.30 pm on Sun 20th March; re-opens on Sat 2nd April Tues 5th April - phone 0161 629 8266 to confirm.)
Calder and Hebble Navigation 31st Jan - 18th Feb 2011
Broad Cut Lock (26) replace time-expired lock gates
Huddersfield Narrow Canal 8th Nov - 17th Dec 2010
Lock 17e, Linthwaite replacement of top and bottom gates
4th Dec - 21st Feb 2011
Lock 17e, Linthwaite rebuild brick lock lining
1st - 11th March 2011 Locks 24e Slaithwaite Annual service and inspection of guillotine gate. Stoppage required as scaffolding will be in place.
4th Jan - 11th March 2011 Lock 26e & 27e Shaw Carr Wood replacement of top and bottom gates
4th Jan - 11th March 2011 Lock 8e Milnsbridge replacement of top and bottom gates
4th Jan - 11th March 2011 Standedge Tunnel Work to enhance communications system in Standedge Tunnel.
Huddersfield Broad Canal no stoppages planned
- -
Leeds and Liverpool Canal 
 
 
 
 
 
 
 
 
Most stoppages planned for this winter (gate replacement, etc) were carried out in August, while the canal was closed)
8th - approx 19th Nov 2010
additional stoppage
Lock 2 (Office Lock) & Lock 4 (Oddy Locks), Leeds repairs to lock gate, cills and paddles
8th - approx 19th Nov 2010
additional stoppage
Lock 91, Appley Bridge (west of Wigan) repairs to lock gate, cill and paddles
8th - approx 26th Nov 2010
additional stoppage
Lock 75, Wigan flight repairs to lock paddle gearing - Wigan flight closed during repairs
8th - approx 26th Nov 2010
additional stoppage
Lock 1, Leigh Branch, Poolstock (Wigan) repairs to lock gate, cills and paddles
8th - 12th Nov 2010
additional stoppage
Millman Swing Bridge (214), Apperley Bridge replacement of bridge motor
15th Nov 2010 (1 day)
additional stoppage
Stockbridge Swing Bridge (197), Riddleston repairs to bridge (boats may pass before 8 am, at 12 noon and after 4 pm)
31st Jan - 2nd 25th March 2011
additional stoppage
revised end date

Lock 34 (Scarland Lock), Gargrave major repair works, gate replacement, grouting and pointing works
8th Nov - 10th Dec 2010
Thorlby Aqueduct, between Skipton and Gargrave fixing of leaks, washwall repairs
8th - 26th Nov 2010
Culvert 27, Aintree leakage repair to culvert
8th - 26th Nov 2010
Culvert 67, Burscough re-construction of collapsed culvert
4th Jan - 4th March 2011 Bickershaw, Leigh Branch stoppage to enable new marina connection
Macclesfield Canal 8th Nov - 24th Dec 2010
Palmerston Street Embankment, Bollington part of section between Adelphi Mill and Clarence Mill dewatered to enable wash wall reconstruction, replacement of coping stones and repair to bed valve
8th Nov - 17th Dec 2010 Bosley Lock 4 regrout chamber sides, restoration of side pond
Peak Forest Canal was: 8th Nov - 24th Dec 2010
now: 21st Feb - 12th March 2011
dates changed
Hyde Bank Tunnel dewatering of tunnel for repairs to tunnel lining
Rochdale Canal 4th Jan - 11th March 2011
stoppage extended
Near Whiteley Railway Viaduct, Hebden Bridge clay repairs to prevent leakage
1st - 11th Mar 2011
Lock 19, Todmorden Annual service and inspection of guillotine gate. Stoppage required as scaffolding will be in place.
1st Feb - 5th Feb 2010
Guillotine Lock 19 Todmorden lock gate repairs- wind below Lock 16 or above Lock 30
8th Nov - 17th Dec 2010
change of dates
Locks 25, Walsden Rebuild lock side and replace gates
4th Jan- 11th Mar 2011
Locks 26, Walsden Replace bottom gates
8th Nov - 17th Dec 2010
Locks 27 & 28, Walsden replace bottom gates
4th Jan- 11th Mar 2011
Locks 40 & 45, Littleborough flight replace top gates
Sheffield and Tinsley Canal no stoppages planned    
Sheffield & South Yorks
Don Navigation
24th - 28th Jan 2011 Ickles Lock, Rotherham replace back planking to lock gate
was: 10th - 14th Jan 2011
31st Jan - 18th Feb 2011
change of dates
Eastwood Lock, Rotherham replace back planking to lock gates
7th - 25th Feb 2011 Doncaster Lock repairs to tail gates to extend life
was: 10th - 14th Jan 2011
31st Jan - 18th Feb 2011
change of dates
Long Sandall Lock replace back planking to lock gates
10th - 11th Jan 2011 Barnby Dun Lift Bridge removal of bridge to enable repairs to bridge structure
7th - 25th Feb 2011 Barnby Dun Lift Bridge replacing repaired bridge
Sheffield & South Yorks
New Junction Canal
no stoppages planned    
Stainforth and Keadby Canal 8th Nov - 3rd Dec 2010
Bramwith Lock replace head and middle gates

Back to Home page