| ||||||
| ||||||
| ||||||
Looking north east at Caroline Street bridge. Two rows of piles were sunk. The space between had been excavated and pre-cast box culvert bridge sections put into position. The spaces on each side of the bridge sections have been in-filled and the piles removed. The tops of the concrete bridge sections have been covered with hard core. The inside edges of the parapets have been clad with stone. The outside of the bridge has being clad. The road across the bridge was re-opened to traffic at the beginning of February 2001.
|
||||||
Home|Canals|Restoration|Links|Bookshop|Wallpaper|Site Map|Contact|Back to top |